Mining Service Project
Mining Service Project
Delivery Phase
Receiving approval
from clients.
Feedback from
employees
Closing the finance
account
Handover of
technical documents
Handover of setup
to client
Overall Testing
and Licensing Phase
Licensing of setup by
third party contractor
or Industry expert
Testing of pumps
and water lines
Execution Phase
Concreting of sump
Design of sumps using
Mini excavator/Muki
Setup of pumps
Installation of plumbing lines,
valves and NRV
Installation of wiring ducts
and completion of wiring
Transportation of equipments
to the planned location on site
Lowering the equipments
into mine
Unloading the equipments
and components on site
Mine Preparation Phase
Measuring and mapping of
area for equipment placement
Installation of safety
equipment
Construction of base for
pumping setup
Safety checks of pathways
and preparation of equipment
base site
Prepare pathways for daily
mining operations
Clearing mine for easy access
and work space for labourers
Clearing mine of any obstacles
that hinder unloading and
installation of components
Approval Phase
Approval of HSE and Licenses
Approval of Budget,risk assesment,
resource management and project
timeline
Approval of Aquisition
Approval of Engineering
Drawings and Design
(internally and with
licensed third part)
Planning Phase
Aquisition and transportation of
materials and equipment
Budgeting
Resource Management
Risk and safety assesment
Estimation of Project Duration
and time
Proposal of Engineering Drawing
Site Visit and Visual Inspection