building a house - exterior
building a house - exterior
exterior finishing
Patios and driveways and other utilities are installed
Many details are installed such as shingles, soffits, siding, etc
Decorative stone work, wood work, etc is installed
roofing and windows
Windows are centered/leveled before being installed
Roofing tiles and corner tiles are sealed and installed
Fascia boards and gutter are installed
Plywood sheathing and asphalt paper are installed
Trusses are approved and installed
exterior walls
"Bucks" are installed for basement windows
Rebar is bent/cut and connected to forms
Wall Forms were coated with release agent
Wall Forms are installed starting with corners
Plate is nailed into footing
drainage
Sewer waste pipes are installed
Wicking process begins adding more gravel
Drainage pipe is installed around perimeter
Gravel poured around Foundation
framing
Second floor wall framing are installed in a similar manner but
uses exterior sheathing as well
Subfloor (floor joists / I beams and top sheathing) is build and
attached using joists hangers
Beams are installed into beam pockets and locked in by
wooden wedges
Framer creates walls on the ground before being attached to
foundation by anchor bolts
Once materials arrive, moisture barriers are installed before
framework (where wood touches concrete)
interior walls
Tar and damp proofing is installed for moisture protection
Holedowns are used to bolt down walls to foundation
Concrete fills the inner wall forms, left to set
Steel bars are installed for strong/straight walls
After Inspection, metal ties are installed into the forms
foundation
iron dowels and placed in footings
concrete and key way put in place
level forms with laserbeam
rebar for extra support
soil testing and replacement
forms installed
footings tested