Mindomo Collaborative Gantt chart software

By Silvana Carpineanu · Updated

Gantt Charts

The 9 Best Gantt Chart Software Tools of 2026, Compared on Features and Price

Our pick, from a biased source: Mindomo, our own product, if your projects start as ideas, because one document is a mind map, an outline and a Gantt chart. For a free Gantt chart, Zoho Projects (up to 5 users) or TeamGantt (one project). For large portfolios, Smartsheet or Wrike. For a work-management suite with a Gantt view, ClickUp, monday.com or Asana.

Top 9 Gantt Chart Software in 2026

How we compared. We looked at what a Gantt chart needs (task dependencies, milestones, critical path, baselines), whether there is a free plan and what it includes, the price of the cheapest plan that has a Gantt view, the platforms, and how much setup a new team needs before its first chart.

Who is comparing. Mindomo is our own product, so weigh our #1 accordingly. Every competitor’s price and plan limit comes from its own pricing page, linked in its section, with the month we checked it. Prices change: check the vendor’s page before you buy.

Why this order. The first five are tools where the Gantt chart is the main view. ClickUp, monday.com, Asana and Zoho Projects are broader work-management suites in which the Gantt chart is one view among several, so they follow, although each is a strong choice if you also need what the rest of the suite does.

Gantt chart software compared. Prices are per month and billed annually, in the currency the vendor’s page showed us. Checked October 2026 (first five) and November 2026 (last four).
Tool Free plan Cheapest plan with a Gantt chart Platforms
Mindomo Yes, without Gantt charts Professional, €13.5 (1 user); Team, €6/user (from 3 users) Web, Windows, macOS, iOS, Android
Smartsheet No (30-day trial) Pro, €8/member Web, iOS, Android
TeamGantt Yes: 1 user, 1 project, 40 tasks Base, $49 flat (1 manager, 10 collaborators) Web, iOS, Android
Wrike Yes, without Gantt charts Team, $10/user Web, iOS, Android
GanttPRO No (14-day trial) Core, $7/user Web, iOS, Android
ClickUp Yes, Gantt charts as a limited trial Core, $9/user Web, desktop, iOS, Android
monday.com Yes (2 seats), without Gantt charts Standard, €12/seat (from 3 seats) Web, desktop, iOS, Android
Asana Yes (2 users), without Gantt charts Starter, $10.99/user Web, desktop, iOS, Android
Zoho Projects Yes: 5 users, 3 projects, Gantt charts included Free; critical path and baselines from Enterprise, €9/user Web, iOS, Android

1. Mindomo

Gantt chart made with Mindomo

⭐Best for: Teams, educators, project managers, and individuals who want both structured planning and creative thinking in one affordable tool.

💰Pricing: It offers a completely free plan, and affordable Premium, Professional, Team and Business plans (from 6€/month). Gantt charts come with the Professional, Team and Business plans.

  • Premium Plan: 6€/month (billed annually): includes mind maps, concept maps, timelines, logic charts, fishbone diagrams, outlines, offline editing, task management, import/export, basic collaboration tools, and cloud storage sync.

  • Professional Plan: 13.5€/month (billed annually): all Premium features plus Gantt charts, for one user and up to 5 guests who edit with premium features.

  • Team Plan: 6€/user/month (annually, minimum 3 users): adds Gantt charts, shared team folders, real-time collaboration, content backup, centralized admin dashboard, and integration with Microsoft Teams, Google Drive, OneDrive, and Dropbox, backups, and more.

  • Business Plan: 10€/user/month: includes Gantt charts, advanced sharing permissions, guest editing, priority support, advanced security, SAML SSO, etc.

💻Platforms: Web, Desktop (Windows and macOS), mobile (iOS and Android).

Mindomo is built around mind mapping: the same document is a mind map, an outline and a Gantt chart, kept in sync, with collaborative task management on top. ClickUp also has a mind map view, but as one of many views in a work-management suite; the Gantt specialists in this list start from the timeline. Mindomo starts from the idea, so brainstorming and scheduling happen in one place.

Unlike many traditional project management tools that feel overwhelming or overly technical, Mindomo is refreshingly easy to use and anyone can jump in without training.

What makes it so powerful? Every project starts with an idea. With Mindomo, you can brainstorm freely, capture and organize your thoughts as mind maps (read more about what is a mind map here), then instantly turn those ideas into actionable tasks and organize them in categories. Once you have a clear structure you can transform the mind map diagram into a Gantt chart with one click. You can switch views to Outline as well. From there, it’s just a matter of planning, assigning, and scheduling tasks.

As your team works, you can track everyone’s progress in real time, get notified about deadlines, and always stay one step ahead with a clear visual overview of who’s doing what, all in one seamless workspace.

This ability to support every stage of a project, from initial brainstorming to task execution and progress tracking, is exactly why Mindomo ranks as the best Gantt chart software of 2026. Even though Mindomo isn’t a traditional project management suite at its core (its primary strength is to be a mind map maker), it offers all essential Gantt chart features and a collaborative workspace through its Team and Business plans, making it a highly capable visual-first solution for managing projects from start to finish.

Key Features:

✅ Gantt charts with four dependency types, auto-scheduling, a critical path and milestones; Microsoft Project import.

✅ Seamlessly switch between mind map, Gantt chart, and outline view: all fully synced and instantly updated.

✅ Built-in task management: deadlines, recurring tasks, priorities, assignees, completion tracking, and notifications.

✅ Real-time collaboration: co-editing, comments, chat, and premium sharing options.

✅ Templates for projects, meetings, plans, and more + Customizable templates.

✅ Cross-platform access: Web, Windows, macOS, iOS, Android, with offline editing on Desktop (including Local-only Desktop: full functionality without Cloud connection) and mobile apps.

✅ Easy learning and simple interface.

✅ Integrations: connect with Microsoft Teams, Google Workspace, OneDrive, Dropbox, and more.

✅ Sync with external calendars like Google Calendar, Microsoft Outlook, and more.

✅ 20+ Export formats (PDF, Excel, CSV, etc.), file attachments, multiple links on topics, interactive comments, notes, etc.

✅ Enterprise-ready: SAML SSO, API access, admin controls, backups, and team spaces

✅ Beyond Gantt charts: build mind maps, concept maps, outlines, fishbone diagrams, timelines, logic trees, and more.

2. Smartsheet

Gantt chart made with Smartsheet

⭐Best for: Mid‑sized to large teams and organizations that need spreadsheet-style flexibility, automation, dashboards, and robust reporting.

💰Pricing: It doesn’t offer a permanent free plan (30-day free trial, no credit card required). It has Pro, Business, Enterprise, and Advanced Work Management plans (starting from €8/member/month, billed annually). Prices as listed on smartsheet.com, checked October 2026.

  • Pro Plan: €8/member/month (billed annually; €11 billed monthly): for 1–10 members, includes grid/kanban/calendar/Gantt views, 250 automations/month, 20 GB storage, and integrations with Microsoft 365, Google Workspace, Slack, Box, Dropbox.

  • Business Plan: €17/member/month (billed annually; €22 billed monthly): for 3+ members, adds unlimited automations, Timeline (enhanced Gantt), team workload tracking, 1 TB storage, dashboards, admin features and enterprise integrations.

  • Enterprise: custom pricing with advanced governance, WorkApps, AI/insights, single-sign-on, and more.

💻Platforms: Web-based with iOS and Android mobile apps only.

Smartsheet is widely adopted in enterprises because it combines the familiarity of spreadsheets with the power of Gantt charts, automation, and dashboard reporting. According to organizations like Palfinger, the platform enabled standardization and collaboration across global teams with minimal effort using drag-and-drop interfaces and no-code automation. This makes it ideal for teams that manage many projects and need consistent reporting and integrations at scale.

However, while Smartsheet is powerful and flexible, it does come with a few trade-offs. Its spreadsheet-style interface can be overwhelming for new users, often requiring training or onboarding to use effectively. Performance may slow with large or complex sheets, and automation limits on lower-tier plans can restrict more advanced workflows. Pricing can also become a concern for growing teams, especially when scaling up to access premium features. While it’s excellent for structured planning, it offers limited support for more visual or creative approaches to project management.

Key features:

✅ Grid, Gantt, Kanban, Calendar & Timeline Views: manage projects in multiple formats with flexibility

✅ Advanced automation: alerts, approvals, update requests, triggers and more (250 per month in Pro; unlimited in Business plan)

✅ Dashboards & Reporting: powerful templates, summary reports, and project/portfolio overviews for stakeholders

✅ Templates & WorkApps: standardized process templates and apps for workflows and governance

✅ Resource management: Basic workload and availability tracking tools for team planning

3. TeamGantt

Gantt chart made with TeamGantt

⭐Best for: Small to mid-sized teams and project stakeholders who want a clean, focused Gantt chart experience and straightforward task collaboration.

💰Pricing: It has a free Personal plan (1 user, 1 project, 40 tasks), and every paid plan comes with a 14-day free trial (credit card required). Paid plans are a flat monthly fee rather than per user, starting from $49/month (billed annually). Prices in USD as listed on teamgantt.com, checked October 2026.

  • Base Plan: $49/month (billed annually as $589/year; $59 billed monthly): 1 manager, 10 collaborators, 5 projects, and 150 tasks per project.

  • Business Plan: from $95/month (billed annually as $1,140/year; $120 billed monthly): unlimited managers and collaborators, 5 projects included (expandable to 20 at $24/month per extra project), and 500 tasks per project.

  • Enterprise Plan: custom pricing: SSO, unlimited projects and tasks.

💻Platforms: Fully web-based; mobile apps for iOS and Android, but no Desktop app.

TeamGantt secured its spot as a top choice for teams seeking a straightforward, visually clear Gantt chart tool. Its user-friendly drag-and-drop interface makes scheduling and task management accessible, especially for small to mid-sized teams.

While it focuses primarily on Gantt charts and task collaboration, it offers enough flexibility to manage multiple projects efficiently without overwhelming users. This balance of simplicity and functionality makes TeamGantt a reliable option for streamlined project planning.

While TeamGantt excels in simplicity and ease of use, it may fall short for larger teams or more complex workflows. It lacks built-in budget or cost tracking, and fully leveraging advanced features like dependencies and resource allocation may require a bit of onboarding. Additionally, the free plan is limited to one project and 40 tasks, and the Base plan to 5 projects, so growing teams quickly need the Business plan, which starts at $95/month.

Key features:

✅ Drag-and-drop Gantt editor: easily adjust tasks, durations, and dependencies with a visual interface

✅ Multiple views: toggle between Gantt, calendar, list, and board formats

✅ Task comments & file attachments: collaborate directly within tasks

✅ Notifications and email reminders: help keep collaborators aligned

✅ Mobile apps: access project schedules and updates on iOS and Android

✅ PDF/CSV export for charts and reports

4. Wrike

Gantt chart made with Wrike

⭐Best for: Medium to large teams and organizations needing advanced collaboration, portfolio reporting, and enterprise-grade security.

💰Pricing: It has a Free plan for basic task management (Gantt charts start on the Team plan) and a 14-day free trial (no credit card required). Paid plans start at $10/user/month for Team, with Business at $25/user/month (billed annually). Higher tiers (Pinnacle, Apex) and add-ons can significantly increase total cost. Prices in USD as listed on wrike.com, checked October 2026.

  • Team Plan: $10/user/month (billed annually) for 2–15 users, includes interactive Gantt charts, AI Essentials, and more.

  • Business Plan: $25/user/month (annual billing only) for 5–200 users, adds a starter pack of AI Elite actions, and more.

  • Pinnacle & Apex Plans: custom pricing for more security (SAML), access roles, advanced reporting, and more.

💻Platforms: Web-based, mobile apps (iOS and Android), including offline support for Gantt charts.

Wrike secures a strong position thanks to its professional-grade task and project management, including powerful Gantt charts, automation, dashboards, and robust reporting. It’s well-regarded for handling complex portfolios across teams and departments, with a high degree of customization. This makes it a go-to for structured project management where visibility, controls, and scale matter.

However, this depth comes with a learning curve, teams often report that onboarding takes time, and fully leveraging Wrike’s capabilities may require dedicated setup and training resources.

Key features:

✅ Interactive Gantt charts & timeline views: full task dependencies, drag-and-drop editing, critical path support

✅ Multiple project views: choose between table (spreadsheet-like), board (Kanban), calendar, and workload visualizations.

✅ Resource and workload management: visualize team capacity and job roles (upgraded plans).

✅ Advanced automation & integrations (add-ons): supports thousands of automated actions and connectors (e.g. Jira, GitHub, Salesforce).

✅ Enterprise-level security: SAML SSO, two-factor authentication, custom access roles and audit reports.

✅ Dashboards & custom reporting: tailored dashboards, BI integration, and exportable reports.

5. GanttPRO

Gantt chart made with GanttPRO

⭐Best for: Small to medium-sized teams, freelancers, and managers who want a clean, focused Gantt chart solution with solid project tracking.

💰Pricing: Offers a 14-day free trial (no credit card required), but no free plan. Paid plans start from $7/user/month (billed annually). Prices in USD as listed on ganttpro.com, checked October 2026.

  • Core Plan: $7/user/month (billed annually): it includes Gantt charts, task status, priority and progress, comments, attachments, and more.

  • Advanced Plan: $10/user/month (billed annually): it offers overdue tasks, project templates, and more.

  • Business Plan: $17/user/month (billed annually): it includes reports, workload view, API, and more.

  • Enterprise Plan: $25/user/month as a limited-time offer (normally $35; minimum 5 users, annual billing only), including custom roles, SAML SSO, unlimited storage, and more.

💻Platforms: Fully web-based with native mobile access (iOS and Android). Offline support is limited; most users rely on the web interface for full functionality.

GanttPRO stands out for delivering streamlined, intuitive Gantt-focused project planning without overwhelming features. With its drag‑and‑drop scheduling, task dependencies, and timeline sharing, it’s especially popular among R&D and engineering teams that need clarity and precision in project visualisation.

Key features:

✅ Interactive Gantt charts with drag‑and‑drop scheduling, task hierarchy, dependencies, milestones, and baselines.

✅ Task management: priorities, statuses, time logs, deadlines, progress tracking, and assignees.

✅ Workload view to monitor team availability and balance assignments (Business plan).

✅ Project templates and reusable structures for faster planning.

✅ Real-time collaboration with comments, mentions, file attachments, and notifications.

✅ Advanced sharing options, including public links and export to PDF/Excel.

✅ Role-based access and user permissions for secure project control.

6. ClickUp

⭐Best for: Teams that want one workspace for tasks, docs, goals and chat, with a Gantt chart as one of its views.

💰Pricing: Its Free Forever plan has unlimited members and tasks, but Gantt charts are only a trial there: a limited number of uses that does not reset. Gantt charts are unlimited from the Core plan. Prices in USD as listed on clickup.com, checked November 2026.

  • Core Plan: $9/user/month (billed annually): unlimited Gantt charts.

  • Business Plan: $17/user/month (billed annually): adds critical path and slack time (a trial on Core).

  • Enterprise: custom pricing.

💻Platforms: Web, desktop apps, and iOS and Android apps.

ClickUp suits teams that want to replace several tools with one, and its Gantt view links tasks with dependencies on every plan. The flip side of that breadth is setup: spaces, folders, lists, custom fields and views take time to configure before a team’s first project plan looks the way it should, and the critical path needs the Business plan.

Key features:

✅ Gantt view with task dependencies on every plan, critical path and slack time on Business

✅ Many views of the same tasks: list, board, calendar, Gantt, mind map and more

✅ Docs, whiteboards, forms and automations in the same workspace

7. monday.com

⭐Best for: Teams that run their work on configurable boards and want a Gantt chart of those boards for scheduling.

💰Pricing: Its Free plan is for up to 2 seats and 3 boards and has no Gantt view; the Basic plan has none either. Gantt charts start on the Standard plan, which, like every paid plan, needs at least 3 seats. Prices in EUR as listed on monday.com, excluding tax and set by billing country, checked November 2026.

  • Standard Plan: €12/seat/month (billed annually, from 3 seats): adds “Timeline & Gantt views”.

  • Pro Plan: €19/seat/month (billed annually, from 3 seats).

  • Enterprise: custom pricing.

💻Platforms: Web, desktop apps, and iOS and Android apps.

monday.com is flexible: every board is a table of items with the columns you choose, and the Gantt chart is a view of that board. That makes it a good fit when the same board also drives approvals, intake forms or a CRM-like pipeline. For a Gantt chart alone it is a costly route: the minimum is 3 seats on Standard, so €36 a month billed annually before you add anyone else.

Key features:

✅ Timeline and Gantt views of any board (Standard plan and up)

✅ Boards with configurable columns, plus kanban and calendar views

✅ Automations and integrations that connect the board to other tools

8. Asana

⭐Best for: Teams that already plan their work in Asana and want timelines and Gantt charts without a separate tool.

💰Pricing: Its free Personal plan is for up to 2 users and has no Gantt view. Gantt charts start on the Starter plan: “Visualize schedules on a timeline and dive into task dependencies and progress with interactive Gantt charts.” Prices in USD as listed on asana.com, checked November 2026.

  • Starter Plan: $10.99/user/month (billed annually; $13.49 billed monthly): Timeline and Gantt views with task dependencies.

  • Advanced Plan: $24.99/user/month (billed annually; $30.49 billed monthly).

  • Enterprise: custom pricing.

💻Platforms: Web, desktop apps, and iOS and Android apps.

Asana is a task manager first: projects are lists of tasks with owners and due dates, and the Gantt and Timeline views lay those tasks out in time with their dependencies. It is clear and widely used, which helps when people outside the project team need to follow along. Teams that plan mainly in Gantt charts will find fewer scheduling controls than in the Gantt specialists above.

Key features:

✅ Gantt and Timeline views with task dependencies (Starter plan and up)

✅ List, board and calendar views of the same project

✅ Rules, forms and integrations around the task list

9. Zoho Projects

⭐Best for: Small teams that want a free Gantt chart, and teams already using other Zoho apps.

💰Pricing: Its Free plan is for up to 5 users and 3 projects, and it includes the Gantt chart with finish-to-start dependencies. Paid plans add the other three dependency types (Premium), then critical path and baselines (Enterprise). Prices in EUR as listed on zoho.com, checked November 2026; the 15-day trial needs no credit card.

  • Premium Plan: €4/user/month (billed annually): unlimited projects, all four dependency types, budgets and timesheets.

  • Enterprise Plan: €9/user/month (billed annually): adds critical path and baselines, dependencies across projects, SSO.

  • Ultimate Plan: €14/user/month (billed annually).

💻Platforms: Web, and iOS and Android apps.

Zoho Projects has the most generous free Gantt chart in this list and low paid prices, with budgets, timesheets and earned value analysis on Premium. Its interface follows the rest of the Zoho suite, which is an advantage if you already use Zoho CRM or Zoho Books and a learning step if you don’t. The critical path and baselines, which many project managers expect from a Gantt tool, start on Enterprise.

Key features:

✅ Gantt chart with dependencies on the Free plan (finish-to-start), all four types from Premium

✅ Critical path and baselines (Enterprise plan)

✅ Budgets, timesheets and earned value analysis (Premium plan and up)

Why use Mindomo as your Gantt chart software?

Mindomo tops our list (and it is our product, as we said at the start), so here is what sets it apart.

✓ Simple & Easy to use tool. Its power consists of simplicity: a simple solution to organize complex projects. Mindomo’s interface offers one clear side where you can add your tasks and all the necessary details and another side for a timeline that helps you visualize the upcoming activities in colorful bars, making it easier to track progress.

✓ Mindomo is more than a regular project management tool: You can instantly turn your Gantt files into mind maps or outlines, using the same diagram maker. Moreover, you can start planning your project in a mind map format (for example, do a brainstorming session) and then transform it into a Gantt framework with one click.

✓ Real-time collaborative Gantt chart maker: share and sync your work with any team member easily and immediately. In addition, you can work in Mindomo online (from any browser) or offline (Desktop app) and sync all the adjustments instantly.

✓ Suitable for complex projects: Mindomo’s Gantt chart includes all the tasks and milestones, an up-to-date timeline, the exact order of activities, completion and priorities levels, and the task assignees.

Discover how to make a Gantt chart with Mindomo in our easy step-by-step guide.

To see all the features of Mindomo’s Gantt charts, visit our Gantt chart software page.